A data center goes up fast. Getting power to it takes years.
On November 19, 2026, Google and Ohio Power Company filed a proposal that makes this point pretty clearly. They want to upgrade about 15.5 miles of existing transmission lines in the Columbus area. For those of us who manufacture cable trays and galvanized conduit, the story is a reminder that power has two ends — the grid outside the fence, and the cables inside the building. Get either one wrong, and the whole thing stalls.
Short version: no new towers, no new right-of-way. They're replacing the conductors on existing lines with advanced ones. The extra cost — about $10.8 million — Google pays out of pocket.
What they get in return: 24 MW of capacity they've already contracted becomes available roughly two years earlier. Down the road, once the planned 765 kV expansion in Central Ohio is built, those upgraded lines are expected to help unlock over 700 MW. The proposal still needs regulatory approval, but if it goes through, the lines could be in service by late 2028.
Here's what's interesting: a big user paying to upgrade a utility's own lines, just to get power sooner. We're not here to debate energy policy. But it tells you how tight power supply has gotten for new data center builds.
Transmission lines get electricity to the site. After that, it still has to reach the servers, the cooling plant, the security systems. The path in between is full of equipment we all know:
Main and secondary switchgear. Transformers. PDUs. UPS systems. Backup generators. Power cables. Control cables. Grounding. Cable trays. Conduit.
Cable routing has to be settled early in the design. Electrical rooms, white space, plant areas — they all need to connect. When routing decisions get pushed late, the installer ends up squeezing trays around pipes and ducts. We've seen plenty of drawings come through our factory. The projects where routing was locked in early? Expansion later on is smooth. The ones where it wasn't? Everybody's fighting for space on site.
We get asked a lot: "What cable tray should we use for a data center?"
There's no single answer to that. One data center project might use perforated, ladder, and trough trays all at the same time. What you use depends on what the drawings tell you — cable weight and count, span between supports, available space, and the standard the project follows.
Perforated tray. Mid-range power and control cables. The openings in the base give you ventilation and tie-down points. This is one of our highest-volume products.
Ladder tray. Heavier cables, larger diameters, longer spans. Open structure, good airflow. But you need to check the load rating and support spacing carefully.
Trough tray (solid bottom). When you need a continuous base, or when dust and debris are a concern. Ventilation is reduced, so cable heating needs a closer look during design.
These are the ones we work with regularly at the factory:
Hot-dip galvanized steel. The standard choice. Most common spec we see for zinc protection.
Zinc-aluminium-magnesium coated steel. Used when the spec allows it and the project wants a different coating system. We've noticed more inquiries about this one in recent years.
Stainless steel. Corrosive environments. Higher cost.
Aluminum. When weight matters.
One thing we want to flag: material, coating, thickness, and load class should all match the project specification line by line. If a supplier's quote doesn't match the spec on any of these, sort it out before you place the order. We've had customers come to us with cheaper quotes from elsewhere — turns out the steel was a gauge thinner, or the coating was a different system entirely. That kind of thing is a problem if you find out after the goods arrive.
Trays handle the main cable routes. Conduit steps in where cables need a closed, rigid path — branching off a tray to reach equipment, or running through specific areas where protection matters.
We manufacture galvanized metal conduit in KBG, JDG, and SC types, with matching fittings. When selecting, check these against your project: pipe diameter and wall thickness, galvanizing method, fitting compatibility, installation environment, and the electrical standard the project follows.
Whether you're talking to us or someone else, these questions are worth asking before you commit:
Can you manufacture to our drawings, including non-standard fittings?
Which standard do the trays follow, and can you provide test reports?
What coating is quoted, and does it match the specification line by line?
What are the lead times, and can deliveries be split by area or phase?
How is the goods packed for sea freight?
What documents come with the order?
Clear requirements make for fast, accurate quotes. That's true on both sides.
Treating the project type as a specification. "Data center" doesn't tell you the tray type, the coating, or the load rating. The drawings do.
Leaving cable routing until late. Trays end up fighting pipes and ducts for space. On-site changes are painful.
Sizing for today only. Is there room for future cables? Is there load capacity to spare?
Comparing quotes on price alone. A lower price might mean thinner steel or a different coating. Check the details.
Not asking for documents early. Product data and test records — inspectors may ask for these. Better to have them ready.
The Ohio proposal shows how much effort goes into getting power to a data center. But once the power arrives, the cable management inside the building has to hold up too. Pick the tray type and material based on the drawings. Match the coating to the spec. Plan routes early. Leave room to grow.
We're Shenzhen Wan'an Industry Co., Ltd. We've been manufacturing cable trays and galvanized conduit since 2004. Perforated, ladder, trough — we make them all. Hot-dip galvanized, zinc-aluminium-magnesium, stainless steel, aluminum — all available. JDG conduit and fittings, all in one order. If you've got a data center or infrastructure project with drawings and a spec sheet, send them over. We'll quote it, and we'll flag anything that needs clarification before you commit.
Sourcing for a data center or infrastructure project? Browse our cable tray systems, hot-dip galvanized perforated cable tray, stainless steel perforated cable tray and galvanized conduit, or contact us
Whatsapp: +86-18823394830