In November 2026, Google paid $10.8 million to upgrade existing transmission lines in Ohio so its contracted 24 MW arrives two years earlier — a clear sign of how tight data center power supply has become. But getting power to the site is only half the job. Inside the building, cable routing, tray selection, material specs, and conduit choices must be locked in early and matched to the drawings. Written from the factory floor at Shenzhen Wanan Industrial a cable tray and galvanized conduit manufacturer since 2004, this article walks through what matters when specifying cable management for data center projects — and the mistakes we've seen more than once.