A supplier can only quote a solar mounting system accurately when it knows the site, the modules, the loads, and the commercial terms. Most delays in quoting come from missing information, not from the design itself: each round of questions can cost days. A good RFQ covers eight things: project basics, module data, environment and loads, ground and foundation, material and coating requirements, commercial terms, attachments, and the contact person. This guide explains what to include in each part, and ends with a checklist you can copy into your own inquiry.
Faster quotes: the supplier does not need to come back with questions, so the first reply can already be a real quotation
More accurate prices: loads, soil, and coating decide the steel weight and the foundation, which are the biggest items in the price
Fair comparison: when every supplier gets the same information, the quotes can be compared on the same basis
Fewer changes later: a design based on correct data is less likely to change after the order
Project name, country, and site location (a map pin or coordinates is useful)
Total capacity, in kW or MW, and whether the project is built in phases
Type of installation: ground, roof (and roof type), carport, floating, or other
Project stage, such as tender, budget estimate, or ready to order
Required delivery date or construction window
Module manufacturer and model, or the datasheet
Module dimensions, weight, and frame thickness
Number of modules, and the layout you plan: portrait or landscape, rows and columns per table
Clamp type and clamping zone requirements from the module maker
Whether the modules are bifacial or framed in a special way
The module datasheet usually answers most of this in one document, so attach it.
Item | What to provide |
|---|---|
Wind load | The design wind speed or wind load for the site, and the code or standard it comes from |
Snow load | The design snow load, or a statement that snow is not a design case |
Design standard | The structural code the project follows, such as a national standard or an international one |
Corrosion environment | Coastal, industrial, desert, farmland, or inland, and any known problem such as salt spray or chemicals |
Temperature range | Minimum and maximum site temperatures, and frost conditions where relevant |
Other design cases | Seismic requirements, maintenance loads, or special conditions |
If you do not have the loads, say so and give the site location. The supplier can often propose values from local codes, but the final design values should be confirmed by the project's engineer.
Soil report or geotechnical survey, if one exists, or a pull-out test result
Terrain: flat or sloped, and the approximate slope and direction
Ground water, flooding, and frost depth where they apply
Foundation preference: ground screw, driven pile, concrete pile, ballast, or let the supplier propose
For roofs: roof type, structure, and whether penetration is allowed
Site restrictions, such as buried services or protected ground
Fixed tilt angle and orientation, or an adjustable tilt requirement
Row spacing or the layout drawing, if the design is already done
Ground clearance, if the project has a minimum, for farming, grazing, or snow
Any special layout, such as a carport bay size or a floating array
Preferred material: hot-dip galvanized steel, zinc-aluminum-magnesium steel, aluminum, or open to proposals
Coating requirement and the standard it follows, or the corrosion class of the site
Design life you expect, and any warranty you require
Whether the structure must be bonded and earthed as part of the supply
Quantity, by capacity or by number of tables
Delivery port or site, and the trade term you want to be quoted
Required lead time, and whether partial shipments are acceptable
Payment terms you can offer
Packing needs, such as container loading or marking for each phase
Documents you need: drawings, calculation, installation manual, material and coating records, test reports
Whether you also need installation guidance or site supervision
Site plan or layout drawing
Module datasheet
Soil report and any survey data
The structural code or project specification, where it is shareable
Photos of the site, or references to similar projects you prefer
Group | Items |
|---|---|
Project | Location, capacity, installation type, stage, delivery date |
Modules | Model, size, weight, frame, quantity, layout, clamping zones |
Loads | Wind, snow, design code, corrosion environment, temperature, other cases |
Ground | Soil report, terrain, water, frost, foundation preference, roof details |
Layout | Tilt, orientation, spacing, clearance, special layout |
Material | Material, coating, design life, warranty, earthing |
Commercial | Quantity, destination, trade term, lead time, payment, packing, documents |
Attachments | Layout drawing, datasheet, soil report, specification, photos |
Asking for a price per watt with no site data. A figure without loads and soil is only a guess.
Leaving out the corrosion environment. The coating can change the price a lot, and a wrong assumption causes problems later.
Sending different information to each supplier. The quotes then cannot be compared.
Quoting before the soil is known. The foundation may be a large share of the cost, so ask for a range and a plan to confirm it.
Forgetting the documents. Drawings, calculations, and records are easier to agree on before the order.
A clear RFQ gets a faster, more accurate, and more comparable quotation. Give the project basics, the module data, the loads and environment, the ground and foundation details, the material and coating requirements, and the commercial terms, and attach the drawings and datasheets you have. Where information is missing, say so and ask the supplier to state its assumptions. Final design values should follow your project specification and the engineer's confirmation.
At least the site location, the type of installation, the capacity, the module model and quantity, and the delivery destination. With wind, snow, soil, and corrosion information, the quote can be much more accurate.
Tell the supplier the site location and the code your project follows. The supplier can propose values to quote on, and the final design values should be confirmed by the project's engineer.
Not always. A budget quote can be made with an assumed foundation type, but the foundation depends on the soil, so a survey or pull-out test is needed before the design is final.
Ready to request a quote? Browse our ground, roof, and carport solar mounting systems, or contact us with your site, modules, and loads, and we will reply with a quotation and the questions we still need answered.